Our Projects

As stated in our mission statement, we are adaptable and solution focused when it comes to our ever-changing water needs in our community. Grants and loans have made it possible for us to act on those needs, and they surface as various kinds of projects that will help us live with water security for years to come. 

Smart Water Meters

Screenshot 2025-12-07 155729.png

Wenden DWID was awarded a Water Conservation Grant administered through the Water Infrastructure Finance Authority of Arizona on February 27, 2024 in the amount of $180,000. 

 

The grant is for the replacement of all mechanical water meters in the water district with digital Advanced Metering Infrastructure (AMI) meters commonly referred to as smart meters.  The information systems in these meters provides near real-time data directly to the office.

Wenden Wastewater Treatment Project

Please choose only one response regarding your opinion on this project.
Centralized wastewater treatment plant using gravity piping.
Pre-treated wastewater from existing septic tanks to centralized treatment plant using low-pressure piping.
Multiple community drainfield treatment systems using septic tanks and low pressure piping.
Hybrid approach by location. Option 2 to the south and Option 3 to the north of the highway.
Baseline (continuation with use of residential onsite septic tanks and residential drainfields) – may not be sustainable because of the failing condition of the existing septic systems and small size of parcels.

Wenden has received a grant from the EPA to investigate the feasibility of creating a a centralized wastewater treatment system.  The initial work is now completed in the form of a Preliminary Engineering Report.  While the department conducted a live feedback session with the public several months ago, it is time to get additional feedback from the community on the subject.  For that purpose, we have prepared, with the help of our partners, a flyer and a video explaining the results of the project for further consideration.

Click here for flyer explaining the project​​

Click here for the Preliminary Engineering Report

Please contribute your thoughts about the wastewater project by filling in the form below. Thank you. ​

 

rtc Ground Squirell 05.jpg

Project Coming...

There are several projects coming our way! Information about a project will be here. 

Project Coming...

There are several projects coming our way! Information about a project will be here. 

rtcbug.jpg

   To make a payment:

  • Mail to P.O. BOX 87 Wenden, AZ 85357

  • Drop box, located by the front gate.

  • In person, during hours of operation.

  • Over the phone by credit card, during hours of operation. 

  • CALL: 928.859.3881

Images provided by R.Tipton of Tiption Creative. Thank you!

EPA grant funding and technical art support provided Sacramento State. Thank you!

Wenden Domestic Water Improvement District

71035 Santa Fe Ave

Wenden, AZ 85357

Hours of Operation:  (also bulk water sales)

Tuesday 8:00 a.m. to 1:00 p.m.

Wednesday 8:00 a.m to 1:00 p.m

Thursday 11:30 a.m. to 4:30 p.m.

Closed certain holidays.

Pleased follow us on 

Facebook! Thank you. 

bottom of page